This shoplot at Sunway Metro was damaged after a fire accident. DEK was tasked to repair the damages & prepare the entire shoplot to increase its rentability. [Note: Project budget inclusive of works for all 4 floors of shoplot]
The main challenge of this project was to identify extent of the fire damage and determining the method of repair accordingly. It was also discovered that many of the hidden wiring & plumbing were damaged and they had to be redone.
The space was cleaned up with all wiring, plumbing & painting works done. The plaster ceiling & additional lighting points also allowed the space to look more bright & spacious compared to the previous design.